Hospitality & Leisure

Parc Y Scarlets Stadium

Parc Y Scarlets Stadium

Project Value: £88K

Location: Llanelli

Project Duration: 14 Weeks

Our involvement:

The Parc Y Scarlets Stadium was constructed to replace the existing facilities at their historic ground at Stradey Park.

To be accepted as an alternative, it was essential that Parc Y Scarlets offered something new and exciting to the Scarlets supporters, whilst also providing efficient and innovative premises from which to operate.

The new stadium offered an opportunity to introduce new technology to ensure that the energy costs were minimised and effectively controlled and a fully integrated BMS was installed to ensure that this opportunity was not wasted.

An extensive range of BMS products were utilised during the construction phase and our relationship with the client continues in order to ensure that the system is progressively enhanced . A BMS supervisor terminal with active graphics has been retrospectively installed, to allow the energy usage to be monitored and wherever possible reduced to a minimum level.

Fairy Hill Hotel

Fairy Hill Hotel

Project Value: £8K

Location: Reynoldston, Swansea

Project Duration: 3 months

Our involvement:

This iconic Grade II listed building, originally named Fairyhill House is situated in Reynoldston, Swansea and dates back to the early eighteenth century. Sadly, after the Second World War, it was allowed it to fall into disrepair until 1982 when restoration work started on the property, eventually becoming a hotel in 1984.

Early into the new Millennium the current owners decided to introduce Energy Management Control equipment to help with their operating costs and maintain their green credentials. With a building of such a historic pedigree, it was vitally important that the installation was sympathetic to the building and discrete was very much the byword of this project.

Building Services Controls were employed directly by the owners and a sophisticated range of Siemens PX controllers and peripheral devices were installed to provide a control system that was effective, easy to use and in accord with the aesthetics of this 5 star hotel.